Track Change Requests
Track change requests for the configuration items.
Change requests address not only new or changed requirements, but
also failures and defects in the work products. Change requests are analyzed to determine the impact that the change
will have on the work product, related work products, and schedule and
cost.
- Initiate and record change requests in the change request
database.
- Analyze the impact of changes and fixes proposed in the change
requests. Changes are evaluated through activities that ensure that they are consistent with
all technical and project requirements. [PA159.IG102.SP101.SubP102.N101]
Changes are evaluated for their impact beyond immediate project or contract
requirements. Changes to an item used in multiple products can resolve an
immediate issue while causing a problem in other applications.
- Review change requests that will be addressed in the next baseline
with those who will be affected by the changes and get their
agreement. Conduct the change request review with appropriate participants. Record the
disposition of each change request and the rationale for the decision, including
success criteria, a brief action plan if appropriate, and needs met or unmet by the
change. Perform the actions required in the disposition, and report the results to
relevant stakeholders.
- Track the status of change requests to closure. [PA159.IG102.SP101.SubP104]
Change requests brought into the system need to be handled in a proficient and
timely manner. Once a change request has been processed, it is critical to close
the request with the appropriate approved action as soon as it is practical. Actions
left open result in larger than necessary status lists, which in turn result in added
costs and confusion.